Blog

Alignment measurements

Turkey, May 21017 – Our team has just completed alignment services on a new building 80m long luxurious yacht. The series of measurements included alignment of v-brackets, stern tube and gearboxes in dry dock conditions. The final measurements which were realized in afloat conditions included the alignment of the engines using as reference the pre-aligned gearboxes. Both propulsion systems are perfectly aligned with the use of system Easy-Laser® E710.